LV EN
WhatsApp Cart 0
Delivered projects

What we have built, fixed and cooled down

Pneumatics, cooling, air preparation and temperature control — from a single component to a whole line. Below: the areas we work in and how a project runs.

Work

Delivered projects

Precise temperature in sapphire crystal growth
Temperature control

Precise temperature in sapphire crystal growth

Falcon Sapphire — Ventspils, Latvia
Task
Hold a precise temperature in the Kyropoulos growth process and read data off the unit, so the process can be monitored.
Solution
An SMC HRS400 thermo-chiller (38 kW) integrated into the process cooling loop + data read-out. Delivered with partners.
Result
A stable, repeatable thermal regime through the whole growth cycle.
View project →
Right-sized automation on Siemens LOGO!
Automation · 3 industries

Right-sized automation on Siemens LOGO!

Food · woodworking · water treatment
Task
Automate an ice-cream line, a woodworking saw and water treatment — without an expensive industrial PLC platform.
Solution
Standard Siemens LOGO! 8 (FBD): 5/2 pneumatics for the saw, a VFD for the conveyor, pump/valve sequences.
Result
Reliable control with >€2000 saved per project (on the PLC part alone); easy to maintain.
View project →
Stainless steel manifold for food production
Metalworking

Stainless steel manifold for food production

Finnish–Swedish ice-cream plant
Task
Manufacture a precise 316L stainless steel manifold for ice-cream production to drawing — identical across the series.
Solution
Machining in 316L stainless: body, several threaded ports and mounting flanges; serial production.
Result
A signed contract to supply 500 units to an export client (Finland–Sweden).
View project →
Product spotlights

One product — in depth

Every so often we take one product off the shelf and explain how to read it, when to choose it and what to swap it with.

Product spotlight · 2026-08-15

SMC CD85 — the ISO 6432 mini cylinders that are always on the shelf

Round stainless mini cylinders Ø8–25 mm — for small motions, grippers and feed units. How to read the code, when to choose them and what to swap them with.

Read the spotlight →
Areas

Where we work

Components from stock — but also the whole solution: design, supply and commissioning.

Cooling

Mould cooling loops, hydraulic and compressor cooling, server rooms and control cabinets. Chillers, heat exchangers, pump sets — sized to the real heat load.

Air preparation

FRL units, dryers, condensate drainage, pressure control. Clean, dry air before it ruins the pneumatics.

Temperature control

Sensors, controllers, heating/cooling loop control. So process temperature is repeatable, not guesswork.

Pneumatics & automation

Cylinders, valves, vacuum, sequence control and electro-pneumatics — from a single assembly to a whole line.

Metalworking

Custom brackets, adapters and plates to drawing or sample — machined at a CNC shop in Rīga.

Process

How a project runs

1

The task

Send a code, a size, a sketch or just a description — a photo of the machine works too. We work out what actually needs solving.

2

Solution and price

We propose the components or solution with a spec and a lead time. If a cheaper equivalent fits — we say so.

3

Delivery / installation

From Rīga stock in 24 h or the EU warehouse in a few days. If needed — installation and commissioning.

4

Handover

We test it in operation and leave a diagram and a spare-parts list, so nothing’s guesswork later.

Got something to solve?

Send a description, a size or a photo of the machine — we usually reply the same day.

Request a quote →